Goose Mine Operations Highlights
- New mobile crushing plant commissioned in August 2026.
- Mobile crushing exceeded an average of 3,000 tonnes per day (“tpd“) of ore from mid-August, in-line with plan.
- Fixed plant crushing throughput is expected to reach a sustained average of 3,200 tpd beginning in October 2026 following completion of planned work on the fixed crushing plant, including Phase 1 upgrades and repairs related to the fire damage.
- Goose Mine is on track to achieve annual production guidance of 170,000 to 200,000 ounces of gold in 2026.
Goose Mine Exploration Highlights
- Infill drill results at Llama confirm interpretation of high-grade mineralization and increase confidence in the current Inferred Mineral Resources below the open pit. Highlight intersections include (core length):
- Drill hole 26GSE749Z2 returned 19.12 grams per tonne (“g/t”) gold over 21.23 meters (“m”) from 463.85 m;
- Drill hole 26GSE749 returned 44.61 g/t gold over 4.65 m from 473.50 m;
- Drill hole 26GSE746Z2 returned 21.72 g/t gold over 10.60 m from 399.05 m;
- Drill hole 26GSE748Z1B returned 44.03 g/t gold over 3.53 m from 354.40 m; and
- Drill hole 26GSE747Z2B returned 10.59 g/t gold over 4.95 m from 357.05 m.
- New discovery of high-grade gold mineralization beyond the western limb of the Nuvuyak structure at Goose Main (core length):
- Drill hole 26GSE750Z2 returned 10.94 g/t gold over 9.95 m from 1,195.90 m (Tattuk zone exploration hole).